gawsworth
PROJECT START February 2021
PROJECT COMPLETE January 2022
PROJECT VALUE *High value contract*
PROJECT LOCATION Macclesfield
LCS Pipework’s work at Gawsworth, Macclesfield consisted of the installation of various pipes, with all pipes installed being tested. Ductile of various sizes and PE electro fusion were also installed. Additionally, the installation of FRC above and below ground was carried out.
Continuing with the project, we went on to complete exaction works, working around the existing WwTW and deep excavation, in a tight area with challenging ground conditions. LCS also installed concrete footpaths, kerbing, tarmac and earth works on the site.
Alongside the high standard works, LCS also met vital deadlines for the client and took essential health and safety measures as consistent through all sites.